5 Reasons Hard Copies Are Obsolete

1. How many Hard Copies do you need?

The answer is none! 

In 2017, there are much more effective methods of delivery for structured data and O&M requirements.

We understand multiple hard copies are often a contractual requirement but this does not mean they shouldn’t be challenged. We have all seen the standard A37 specification within the Employers Information Requirements [EIRs], here’s a typical example:

However, in our experience, when a client is informed of the problems associated with paper copies and the direct cost saving available by reducing them, it is often possible to eliminate hard copies entirely.

“The days of archive boxes of paper at PC are long gone and we at Createmaster are passionate about improving the standard of construction handover information by adopting the latest technology and process improvements.”
Createmaster- Managing Director

2. The problem with hard copies

The simple truth is that once a hard copy is delivered to site, it is rarely looked at and provides limited benefit to the end user.

Common problems associated with hard copy O&Ms:

  • Costly to produce
  • Quick to become out of date
  • Large storage requirements
  • Susceptible to loss and damage
  • Difficult to locate information

3. Benefits of paperless alternatives

Delivering project data through the cloud has numerous benefits for the end user over traditional paper methods:

  • Cost saving
  • Simple to navigate
  • Data secure and backed up
  • Access from anywhere at anytime
  • Ability to integrate with client systems

4. Why not invest in hosting instead?

The cost saving from eliminating hard copies can be invested in services much more beneficial to end users such as hosting agreement, which provides:

  • 24/7 access to real project data
  • Updates for future fit-out and alterations
  • On-going training and support for all end users

5. Or an enhanced asset register & PPM schedule

Often, when a building manager takes occupation, the first thing they do is procure an expensive manual survey to identify what plant they have inherited.  This is because key asset data is often buried within hundreds of pages of paper O&M manuals.

By investing in an on-line asset register and planned preventative maintenance schedule (PPM), building managers can avoid this cost and plan for occupation well in advance. Benefits include;

  • Early availability of asset data
  • Day zero PPM
  • Mobilise staff and procure maintenance contracts
  • Integrate with existing CAFM systems

Lets stop printing paper copies and consider switching to cloud based solutions that better serve the needs of end users.

Get In Touch

Give us a call, drop us an email or request a call back for more information. Tel: +44 020 3668 2000
Email: info@createmaster.co.uk

Thanks!

We will be in touch shortly to find out how we can help.


Looking for O&M services?

Operation & Maintenance Manuals

Operation & Maintenance
Manuals

Mechanical & Electrical O&Ms

Mechanical & Electrical
O&Ms